About Us|Blog/News|Careers|For Immediate Assistance Call 937.692.5107
|

GET IN TOUCH
Loading

North Dixie Drive Improvements Phase 5A

Widened North Dixie from Bartley to about 500’ north of Jewelston from two (2) lanes to five (5) lanes. The project included 4800’ of water line and 7000’ of storm line. Curbs and sidewalks were added to both sides of the project. The job involved multiple phases to allow traffic to be maintained for the duration of the project.

Location

Dayton, OH

Category

Highways

  • Highways
  • Highways2
  • Highways3
  • Highways4